<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Society Of Marine Science and Technology</PublisherName>
				<JournalTitle>International Journal Of Coastal, Offshore And Environmental Engineering(ijcoe)</JournalTitle>
				<Issn>2980-8731</Issn>
				<Volume>5</Volume>
				<Issue>1</Issue>
				<PubDate PubStatus="epublish">
					<Year>2020</Year>
					<Month>04</Month>
					<Day>01</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Seismic Design of Subsea Jumper per ISO: Part I- Preliminaries</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>31</FirstPage>
			<LastPage>43</LastPage>
			<ELocationID EIdType="pii">149339</ELocationID>
			
<ELocationID EIdType="doi">10.29252/ijcoe.4.1.31</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>Sirous</FirstName>
					<LastName>Yasseri</LastName>
<Affiliation>Brunel University London</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2022</Year>
					<Month>05</Month>
					<Day>06</Day>
				</PubDate>
			</History>
		    <Abstract>Subsea rigid steel spools (spool) are used to connect subsea equipment using diver-less connectors. Spools must meet functional requirements such as pressure, temperature, thermal expansion, environmental load, installation loads, lack of fit (misalignments), etc., yielding numerous loading conditions.  The installation accuracy that the installation contractor can achieve is another issue.  Thus, it is inevitable that numerous geometries to be investigated and perform several iterations in search of a suitable configuration.  The no-burst concept, in conjunction with a High Integrity Pressure Protection (HIPP) system, leads to heavier spool wall thickness, hence less structural flexibility which in turn increases reactions on the subsea connectors, which in turn is transferred to the adjoining equipment. Add to this complexity, the seismic qualification requirement if a jumper is in an earthquake-prone area.  </Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Subsea Spools</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Soil- spool interaction</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">ISO 19901</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">ISO 19902</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Geohazard</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">ALE and ELE</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://www.ijcoe.org/article_149339_0ae520bdd938399286c0344e58c4de5b.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
